亚洲人成人无码www影院_天天做天天爱天天综合网电影_国产午夜三级一区二区三_亚洲AV无码精品蜜桃_少妇人妻偷人精品无码视频新浪

石灰回轉(zhuǎn)窯廠家|江蘇石灰回轉(zhuǎn)窯廠家|... 立磨|礦渣立磨|石灰石立磨|煤立磨|... 輥壓機(jī)|PFG系列輥壓機(jī)|水泥輥壓機(jī)... 紅土鎳礦回轉(zhuǎn)窯|鎳礦回轉(zhuǎn)窯|紅土鎳礦... 棒磨機(jī)|鋼渣棒磨機(jī)|棒磨機(jī)制砂|棒磨... 鋼渣處理生產(chǎn)線|鋼渣制砂生產(chǎn)線|鋼渣... 粉煤灰球磨機(jī)|粉煤灰超細(xì)粉球磨機(jī)|超... 鈦白粉回轉(zhuǎn)窯|鈦白粉回轉(zhuǎn)窯生產(chǎn)線 鵬飛球磨機(jī)|鵬飛牌球磨機(jī)|水泥球磨機(jī)... 石粉球磨機(jī)|脫硫石粉球磨機(jī) 風(fēng)掃磨|風(fēng)選磨|球破磨|球破機(jī)廠家 烘干原料磨|干法原料磨 石灰氮回轉(zhuǎn)窯 水泥回轉(zhuǎn)窯 鋰輝石焙燒回轉(zhuǎn)窯|碳酸鋰回轉(zhuǎn)窯|碳酸... 氧化鋅回轉(zhuǎn)窯 陶粒回轉(zhuǎn)窯|陶粒砂回轉(zhuǎn)窯|陶粒生產(chǎn)線... 高嶺土回轉(zhuǎn)窯|菱鎂礦回轉(zhuǎn)窯|菱鐵礦回... 陽極爐|NGL爐|回轉(zhuǎn)式陽極爐 加氣磚球磨機(jī)|加氣磚生產(chǎn)線專用球磨機(jī) 濕法球磨機(jī)|濕法磨 礦渣輥壓機(jī)|礦粉輥壓機(jī) 危廢回轉(zhuǎn)窯|污泥回轉(zhuǎn)窯|危廢焚燒回轉(zhuǎn)窯 立式磨煤機(jī)|煤立磨|HRM磨煤機(jī)廠家... 硅砂球磨機(jī)|石英砂球磨機(jī) 氧化球團(tuán)回轉(zhuǎn)窯|球團(tuán)礦回轉(zhuǎn)窯|鏈篦機(jī)...
各系統(tǒng)聯(lián)動(dòng)空載及加載試車-PFG系列輥壓機(jī)使用說明書(5)

第八章 PFG輥壓機(jī)各系統(tǒng)聯(lián)動(dòng)空載及加載試車

Chapter 8 Each System Linkage No-load and Load Test

.各系統(tǒng)空載聯(lián)動(dòng)試車的條件

1. Conditions for the no-load linkage test of each system

1.主機(jī)部分

1. Main machine part

所有地腳螺栓均已擰緊;

All anchor bolts have been tightened;

所有聯(lián)接件及螺栓組均已按規(guī)定安裝完畢;

All connecting parts and bolt groups have been installed according to regulations;

移動(dòng)輥水平移動(dòng)自如,無任何可能妨礙其運(yùn)動(dòng)的雜物;

The moving roller moves freely horizontally without any debris that may hinder its movement;

磨輥轉(zhuǎn)動(dòng)靈活;

The grinding roller rotates flexibly;

2.傳動(dòng)部分

2. Driving part

傳動(dòng)系統(tǒng)空載試車完畢;

The no-load test run of the driving system is completed;

檢查確認(rèn)主電機(jī)、扭矩支承的地腳螺栓是否擰緊;

Check whether the anchor bolts of the main motor and torque support are tightened;

萬向節(jié)傳動(dòng)軸安裝完好,法蘭盤聯(lián)接螺栓及傳動(dòng)軸軸承座與底盤的聯(lián)接螺栓均已按規(guī)定擰緊;

The universal joint drive shaft is installed intact, and the flange connecting bolts and the connecting bolts between the drive shaft bearing seat and the base plate have been tightened according to regulations;

減速器在空載試車中未發(fā)任何不正,F(xiàn)象,溫升較小;

The reducer did not show any abnormality during the no-load test, and the temperature rise was small;

主電機(jī)及控制柜接線正確;其散熱條件符合產(chǎn)品規(guī)定要求,溫升較小;

The main motor and control cabinet are wired correctly; Their heat dissipation conditions meet the product requirements, and the temperature rise is small;

3.液壓系統(tǒng)

3. Hydraulic system

液壓油箱內(nèi)液壓油量合適;

The amount of hydraulic oil in the hydraulic oil tank is appropriate;

蓄能器充氣壓力合適;

The charging pressure of the accumulator is appropriate;

液壓缸進(jìn)退移動(dòng)靈活;

The hydraulic cylinder moves forward and backward flexibly;

所有壓力控制閥和壓力控制儀表調(diào)整完畢;

All pressure control valves and pressure control instruments have been adjusted;

液壓系統(tǒng)靜態(tài)保壓性能良好,控制在規(guī)定所要求的壓降范圍內(nèi)。

The static pressure holding performance of the hydraulic system is good, and it is controlled within the required pressure drop range.

4.檢測(cè)系統(tǒng)

4. Detection system

位移傳感器反應(yīng),檢測(cè)靈敏;

Displacement sensor response, with sensitive detection;

熱電阻溫度指示正確;

The temperature indication of the thermal resistance is correct;

壓力傳感器及二次顯示儀表可正常檢測(cè);

The pressure sensor and secondary display instrument can be detected normally;

5.主機(jī)控制柜內(nèi)各儀表的聯(lián)鎖控制接線正確。

5. The interlocking control wiring of each instrument in the main machine control cabinet is correct.

6.潤(rùn)滑系統(tǒng)

6. Lubrication system

潤(rùn)滑泵工作壓力正常;

The working pressure of the lubricating pump is normal;

各分油器及各管路均暢通;

All oil separators and all pipelines are unblocked;

主軸承內(nèi)已加好充足的潤(rùn)滑脂;

Sufficient grease has been added to the main bearing;

分油器正常工作檢測(cè)完好;

The oil separator is in good condition when working normally;

潤(rùn)滑油泵貯油筒空油報(bào)警正常;

The alarm for empty oil in the lubricating oil pump reservoir is normal;

泵站油脂過濾網(wǎng)清干凈;

Clean the grease filter of the pump station;

泵站限壓閥調(diào)節(jié)完畢。

The pressure limiting valve of the pumping station has been adjusted.

.整機(jī)空載聯(lián)動(dòng)試車

2. The whole machine no-load linkage test run

1.啟動(dòng)順序

1. Startup sequence

啟動(dòng)主機(jī)控制柜;

Start the main machine control cabinet;

啟動(dòng)集中潤(rùn)滑系統(tǒng);

Start the centralized lubrication system;

啟動(dòng)主電動(dòng)機(jī);

Start the main motor;

啟動(dòng)液壓泵電機(jī)。

Start the hydraulic pump motor.

2.空載聯(lián)動(dòng)試車內(nèi)容:

2. No-load linkage test run content:

電接點(diǎn)壓力表可控制油泵電機(jī)的啟閉靈敏;

The electric contact pressure gauge can control the opening and closing of the oil pump motor;

將電接點(diǎn)壓力表上限調(diào)至超過所調(diào)壓力傳感器的上限,試驗(yàn)液壓系統(tǒng)壓力達(dá)到壓力傳感器表上限時(shí),主電動(dòng)機(jī)可否立即停機(jī);

Adjust the upper limit of the electric contact pressure gauge to exceed the upper limit of the adjusted pressure sensor. When the test hydraulic system pressure reaches the upper limit of the pressure sensor gauge, can the main motor be stopped immediately;

把液壓系統(tǒng)各閥調(diào)至使移動(dòng)輥退回狀態(tài),使移動(dòng)輥退到最大輥縫(60mm)位置,檢驗(yàn)主電動(dòng)機(jī)是否在此時(shí)立即停機(jī);

Adjust the valves of the hydraulic system to the retracted state of the moving roller, so that the moving roller is retracted to the maximum roller gap (that is, 60mm), and check whether the main motor stops immediately at this time;

將液壓系統(tǒng)壓力調(diào)至壓力傳感器的調(diào)定壓力上,檢驗(yàn)其是否可在此壓力下液壓系統(tǒng)自動(dòng)卸壓;

Adjust the pressure of the hydraulic system to the set pressure of the pressure sensor, and check whether it can automatically relieve the pressure of the hydraulic system under this pressure;

集中潤(rùn)滑系統(tǒng)是否按規(guī)定的停、開時(shí)間工作,分別將4只端面熱電阻取出,施加一大于80℃的溫度負(fù)荷,檢驗(yàn)主電動(dòng)機(jī)是否立即停機(jī);

Whether the centralized lubrication system works according to the specified stop and start time, take out the 4 end face thermal resistors, apply the temperature load greater than 80 , and check whether the main motor stops immediately;

在運(yùn)轉(zhuǎn)過程中,注意檢查各系統(tǒng)及零部件工作是否正常;

During operation, pay attention to check whether each system and parts work normally;

輥壓機(jī)空載聯(lián)動(dòng)試運(yùn)轉(zhuǎn)需2小時(shí),在此期間,應(yīng)按規(guī)定給各潤(rùn)滑點(diǎn)加好所需的潤(rùn)滑脂,并注意檢查集中潤(rùn)滑系統(tǒng)是否按規(guī)定定時(shí)為各集中潤(rùn)滑點(diǎn)供油。

The no-load linkage test operation of the roller press takes 2 hours. During this period, the required grease should be added to each lubrication point according to the regulations, and attention should be paid to check whether the centralized lubrication system supplies oil to the centralized lubrication points regularly.

.加載試車條件

3. Load test conditions

1.所有出料系統(tǒng)設(shè)備空載試運(yùn)轉(zhuǎn)正常:

1. The no-load test operation of all discharge system equipment is normal:

各輸送設(shè)備運(yùn)轉(zhuǎn)靈活,空載電機(jī)工作電流正常,無較大摩擦聲音;

The conveying equipment operates flexibly, the working current of the no-load motor is normal, and there is no loud friction sound;

各出料輸送設(shè)備與主機(jī)聯(lián)鎖正常,一旦出料系統(tǒng)中某一設(shè)備出現(xiàn)故障,主機(jī)隨即停止。

The interlocking of each discharging conveying equipment and the main machine is normal. Once a certain device in the discharging system fails, the main machine will stop immediately.

2.主機(jī)空載聯(lián)動(dòng)試車完畢,各系統(tǒng)及零部件工作正常;

2. The main machine no-load linkage test is completed, and all systems and parts are working normally;

3.進(jìn)料系統(tǒng)各設(shè)備空載試運(yùn)轉(zhuǎn)正常。

3. The no-load test operation of each equipment of the feeding system is normal.

各輸送設(shè)備運(yùn)轉(zhuǎn)靈活,空載電機(jī)工作電流正常,設(shè)備工作聲音正常;

The conveying equipment operates flexibly, the working current of the no-load motor is normal, and the equipment working sound is normal;

各進(jìn)料輸送設(shè)備與主機(jī)聯(lián)鎖正常,若主機(jī)或出料系統(tǒng)發(fā)生故障,可立即停機(jī);

The interlocking of each feeding and conveying equipment with the main machine is normal. If the main machine or the discharge system fails, it can be shut down immediately;

4.進(jìn)料系統(tǒng)中的除鐵器和金屬探測(cè)器工作正常,并已與主機(jī)聯(lián)瑣。

4.The iron separator and metal detector in the feed system are working normally and have been connected to the main machine.

5.進(jìn)料系統(tǒng)中的稱重料倉(cāng)必須是放空狀態(tài),防止安裝中的一些鐵塊及異物混于倉(cāng)中,損壞設(shè)備.

5. The weighing bin in the feeding system must be emptied to prevent some iron blocks and foreign objects from mixing in the bin and damaging the equipment.

注意:禁止在系統(tǒng)未設(shè)除鐵器和金屬探測(cè)器或除鐵器和金屬探測(cè)器未檢測(cè)正常的狀況下啟動(dòng)輥壓機(jī)帶料運(yùn)行,否則輥間高壓狀況下物料中的金屬鐵件會(huì)給輥面帶來不可預(yù)料的損傷。

Note: It is forbidden to start the roller press with material running when the system is not equipped with iron remover and metal detector or the iron remover and metal detector are not detected normally. Otherwise, the metal iron parts in the material under the high pressure between the rollers will cause unexpected damage to the roller surface.

注意:禁止輥間有物料或物件時(shí),輥壓機(jī)帶料啟動(dòng)。

Note: It is forbidden to start the roller press with materials when there are materials or objects between the rollers.

.加載試車及調(diào)試

    4. Loading test run and debugging

注意:輥壓機(jī)加載試車的壓力采用逐步加壓的方式以保證設(shè)備的磨合,禁止在首次加載試車時(shí)直接將壓力加至 9MPa。

Note: The pressure of the roller press during the test run is gradually increased to ensure the running-in of the equipment. It is forbidden to directly increase the pressure to 9MPa during the first test run.

注意:輥壓機(jī)物料粒度必須滿足要求,即 95%≤40mm,Fmax≤60mm,否則由于進(jìn)料粒度過大會(huì)導(dǎo)致輥壓機(jī)運(yùn)行不穩(wěn)定或跳停。

Note: The particle size of the roller press must meet the requirements, that is, 95%40mm, Fmax60mm, otherwise the roller press will run unstable or stop due to excessive feed size.

注意:輥壓機(jī)最高喂料溫度必須<100℃, 過高物料溫度會(huì)大為縮短輥面壽命。

Note: The maximum feeding temperature of the roller press must be <100, too high material temperature will greatly shorten the life of the roller surface.

1.首次加載及調(diào)試

1. First loading and debugging

初調(diào)進(jìn)料裝置的插板于最低位置;

Initially adjust the insert plate of the feeding device to the lowest position;

開啟進(jìn)料系統(tǒng),將稱重倉(cāng)的料位加到設(shè)定的高度,并保持料位高度在6080%之間,注意調(diào)節(jié)給料量;

Turn on the feeding system, add the material level of the weighing bin to the set height, and keep the material level between 60% and 80%, pay attention to adjusting the feeding amount;

起動(dòng)液壓油泵電機(jī),給液壓系統(tǒng)加壓,使壓力逐步上升(5,6,7,7.5,8×105 Pa),每次上升都要取樣分析;

Start the hydraulic oil pump motor and pressurize the hydraulic system to gradually increase the pressure (i.e. 5, 6, 7, 7.5, 8×105 Pa), and sample and analyze each time it rises;

在加載過程中,應(yīng)注意觀察移動(dòng)輥是否一直在作水平移動(dòng),若移動(dòng)輥靜止不動(dòng)或偶然移動(dòng)一次,并且主電機(jī)工作電流較小,則應(yīng)將進(jìn)料插板適當(dāng)提高,使工作輥縫大于原始輥縫,移動(dòng)輥水平移動(dòng)頻繁。每次對(duì)擠壓物料的取樣均應(yīng)在該狀態(tài)下進(jìn)行;

During the loading process, pay attention to observe whether the moving roller has been moving horizontally. If the moving roller is stationary or accidentally moved once, and the main motor working current is small. The feed insert should be appropriately increased to make the working roll gap larger than the original roll gap, and the moving roll moves horizontally frequently. Each sampling of the extruded material should be carried out in this state;

在加壓和調(diào)試過程中,應(yīng)注意觀察主電動(dòng)機(jī)的電流變化情況,其平均電流不允許超過主電機(jī)額定電流;

In the process of pressurization and debugging, pay attention to observe the current changes of the main motor, and the average current must not exceed the rated current of the main motor;

首次加載試車時(shí)間1小時(shí),在此期間應(yīng)注意觀察機(jī)械和電氣各部分設(shè)備的運(yùn)轉(zhuǎn)及工作情況。注意檢查主軸承、減速機(jī)及電動(dòng)機(jī)的溫度。注意各檢測(cè)儀表和顯示儀表的變化情況。仔細(xì)傾聽設(shè)備有無異常聲音。

The first loading test time is 1 hour, during which time, attention should be paid to observe the operation and working conditions of the mechanical and electrical equipment. Pay attention to check the temperature of the main bearing, reducer and motor. Pay attention to the changes of the detection instruments and display instruments. Listen carefully for abnormal sounds from the equipment.

關(guān)閉輥壓機(jī)及其附屬設(shè)備。將所有的聯(lián)接螺栓、地腳螺栓重新擰緊一遍。對(duì)于重要的螺栓,縮套聯(lián)軸器縮緊螺栓,萬向節(jié)傳動(dòng)軸承座與底座的聯(lián)接螺栓,減速機(jī)聯(lián)接螺栓等均應(yīng)按規(guī)定的力矩重新擰緊,對(duì)設(shè)備其他部分進(jìn)行仔細(xì)檢查,及時(shí)發(fā)現(xiàn)設(shè)備隱患;

Close the roller press and its auxiliary equipment. Tighten all the connecting bolts and anchor bolts again. For important bolts, shrink sleeve coupling tightening bolts, connecting bolts between universal joint drive bearing seat and base, and reducer connecting bolts should be re-tightened according to the specified torque. Carry out the careful inspection of other parts of the equipment and discover hidden dangers in time;

在正式啟動(dòng)前必須對(duì)設(shè)備的關(guān)鍵部分定人員、定崗位、定責(zé)任進(jìn)行操作和監(jiān)視;

Before the official start-up, the key parts of the equipment must be assigned personnel, assigned positions, and assigned responsibilities to operate and monitor;

所有人員必須預(yù)先熟悉和了解設(shè)備的性能及主要結(jié)構(gòu);

All personnel must be familiar with and understand the performance and main structure of the equipment in advance;

啟動(dòng)時(shí)同意指揮,未經(jīng)許可不得啟動(dòng)設(shè)備;

    Agree to command when starting, and not start the equipment without permission;

11)發(fā)現(xiàn)異常情況及時(shí)報(bào)告,及時(shí)處理。一般處理故障時(shí)應(yīng)停機(jī)、卸壓。

11) Report the abnormal situation in time and deal with it in time. Generally, stop and relieve the pressure when troubleshooting.

2、第二次加載試車

2. The second test run

在對(duì)首次加載試車時(shí)取出的試樣進(jìn)行分析的基礎(chǔ)上,初選一較為合適操作參數(shù)。即在較大的處理量和較小的擠壓狀態(tài)下,達(dá)到好的擠壓效果;

Based on the analysis of the samples taken out during the first loading test, the preliminary selection of more suitable operating parameters. That is, the good extrusion effect can be achieved under the larger processing capacity and the smaller extrusion state;

開啟輥壓機(jī)及其附屬設(shè)備,用選擇好的參數(shù)進(jìn)行操作,并將擠壓后的物料送入下一工序中。根據(jù)整個(gè)粉磨工藝系統(tǒng)的物料平衡和綜合粉磨效果調(diào)節(jié)輥壓機(jī)的操作參數(shù),以求達(dá)到預(yù)計(jì)的粉磨效果;

Turn on the roller press and its auxiliary equipment, operate with the selected parameters, and send the extruded materials to the next process. Adjust the operating parameters of the roller press according to the material balance and comprehensive grinding effect of the entire grinding process system to achieve the expected grinding effect;

第二次加載應(yīng)連續(xù)試車12個(gè)小時(shí),此時(shí)設(shè)備各部分的溫度已基本平衡,應(yīng)注意觀察。仔細(xì)傾聽主軸承和行星減速機(jī)中有無異常聲音,檢查主軸承的溫度及主電機(jī)的運(yùn)轉(zhuǎn)狀況。主軸承的工作溫度一般不超過70℃,短時(shí)間不可超過80℃,減速機(jī)工作聲音正常,溫度適當(dāng),外殼偏轉(zhuǎn)平穩(wěn)而有規(guī)律,主電機(jī)聲音正常,平均電流在額定范圍內(nèi)。

The second load should be tested continuously for 12 hours. At this time, the temperature of each part of the equipment has been basically balanced, and attention should be paid to observe. Listen carefully for abnormal sounds in the main bearing and planetary reducer, and check the temperature of the main bearing and the operating condition of the main motor. The operating temperature of the main bearing generally does not exceed 70°C, and should not exceed 80°C in a short time. The reducer's operating sound is normal, the temperature is appropriate, the housing deflection is stable and regular, the main motor sound is normal, and the average current is within the rated range.

對(duì)于系統(tǒng)加載試車的調(diào)試,主要是調(diào)試以下兩方面的內(nèi)容:一、找到輥壓機(jī)的最佳運(yùn)行參數(shù),二、找到整個(gè)系統(tǒng)的運(yùn)行平衡點(diǎn),所謂最佳的運(yùn)行參數(shù),就是以最經(jīng)濟(jì)的擠壓力獲得最佳的擠壓效果,液壓系統(tǒng)的工作壓力并不是越高越好,有實(shí)驗(yàn)表明,當(dāng)液壓力超過8Mpa時(shí),被擠壓粉碎過的物料在高壓力作用下有重新聚結(jié)成塊的趨勢(shì),因此,液壓系統(tǒng)的壓力并不是以高為原則,而是由物料物理性能所決定,同時(shí)受到電機(jī)額定電流的限制,液壓力的選擇原則是:在滿足擠壓物料的工藝性能前提下,盡可能降低操作壓力,壓力選擇的合適與否,可以從取出的物料中找出外形完整的物料顆粒,用手是否能碾碎來判斷,若絕大數(shù)這樣的顆粒都可碾碎,就可認(rèn)為壓力選取基本合適,判斷系統(tǒng)運(yùn)行的平衡與否,我們是直觀地從穩(wěn)流稱重倉(cāng)來獲取判斷的,若穩(wěn)定稱重倉(cāng)的料位始終平衡在6080%,則我們認(rèn)為系統(tǒng)處于平衡狀態(tài)。為了優(yōu)化輥壓機(jī)的運(yùn)行,在系統(tǒng)中輥壓機(jī)一般都有25%的回料,同時(shí)回料的多少可依據(jù)進(jìn)料粒度的特性做一些調(diào)整,當(dāng)進(jìn)料粒度較小,顆粒分布均齊時(shí),我們可以適當(dāng)減少回料量,這樣可以在輥壓機(jī)通過量不變的情況下增加新給量,以提高系統(tǒng)的產(chǎn)量,當(dāng)進(jìn)料粒度較大,顆料分布不均齊時(shí),應(yīng)適當(dāng)加大回料量,一方面回輥壓機(jī)的物料可填充大顆粒間的間隙,實(shí)行料層粉碎,增強(qiáng)擠壓效果,另一方面由于改善了進(jìn)料粒度分布,輥壓機(jī)的振動(dòng)也會(huì)減少,運(yùn)行驅(qū)于平穩(wěn)。

For the commissioning of the system loading test run, the following two aspects are mainly commissioned: 1. Find the best operating parameters of the roller press, 2. Find the operating balance of the entire system, the so-called optimal operating parameters is to obtain the best extrusion effect with the most economical extrusion force. The working pressure of the hydraulic system is not as high as possible. Experiments have shown that when the hydraulic pressure exceeds 8Mpa, the crushed materials have the tendency to re-agglomerate under high pressure. Therefore, the pressure of the hydraulic system is not based on the principle of high, but determined by the physical properties of the material. At the same time, it is limited by the rated current of the motor. The selection principle of hydraulic pressure is: Under the premise of satisfying the process performance of the extruded material, reduce the operating pressure as much as possible. Whether the pressure is selected properly or not, you can find out the complete shape of the material particles from the material taken out, and judge whether it can be crushed by hand. If most of these particles can be crushed, it can be considered that the selection of pressure is basically appropriate. To judge whether the system is in balance or not, we intuitively obtain the judgment from the steady flow weighing bin. If the material level of the stable weighing bin is always balanced at 60-80%, we think the system is in the balanced state. In order to optimize the operation of the roller press, the roller press in the system generally has 25% return material. At the same time, the amount of returned material can be adjusted according to the characteristics of the feed size. When the feed size is small and the particle distribution is uniform, we can appropriately reduce the amount of returned material, so that the throughput of the roller press is unchanged. Increase the new feed volume to increase the output of the system, when the feed size is large and the particle distribution is uneven, the amount of returned material should be increased appropriately. On the one hand, the material returned to the roller press can fill the gaps between large particles, pulverize the material layer, and enhance the extrusion effect. On the other hand, due to the improved particle size distribution of the feed, the vibration of the roller press will also be reduced and the operation will be smooth.

 

 

 

 

 

 

 

 打印本頁 【關(guān)閉窗口】 向上
Copyright © 江蘇鵬飛集團(tuán)股份有限公司 All Rights Reserved. 蘇ICP備17020817號(hào)-4 制作維護(hù):海安雙贏網(wǎng)絡(luò)技術(shù)有限公司